Key Construction Technology of Super Large Diaphragm Wall Reinforcement Cage
文献摘要:
The longest reinforcement cage of the Shenzhen LNG Receiving Station ' s underground continuous wall is 59. 5m, and the total lifting weight is more than 110t. It is a super large reinforcement cage, which is extremely tough to construct and lift. The quality of reinforcement cage processing is guaranteed by adopting the mold frame and a reasonable processing procedure. Feasible technical scheme and quality and safety assurance measures are put forward from the aspects of site layout, hoisting equipment selection, hoisting point layout and hoisting process control to ensure the safe implementation of super large underground continuous wall reinforcement cage hoisting operation. Combined with the project example, the construction challenge of super large underground continuous wall reinforcement cage is solved by adopting the construction technology of integral fabrication and hoisting.
文献关键词:
作者姓名:
SHI Jiangchuan;LIU Weiwei;NIE Yanxia;CHENG Peichun
作者机构:
China Construction First Group Construction&Development Co.,Ltd.,Beijing 100102,China;Installation Engineering Co.,Ltd.of First Bureau Group of CSCEC,Beijing 102600,China
引用格式:
[1]SHI Jiangchuan;LIU Weiwei;NIE Yanxia;CHENG Peichun-.Key Construction Technology of Super Large Diaphragm Wall Reinforcement Cage)[J].施工技术(中英文),2022(09):114-120
A类:
B类:
Key,Construction,Technology,Super,Large,Diaphragm,Wall,Reinforcement,Cage,longest,reinforcement,cage,Shenzhen,LNG,Receiving,Station,underground,continuous,wall,5m,total,lifting,weight,more,than,110t,It,super,large,which,extremely,tough,quality,processing,guaranteed,by,adopting,mold,frame,reasonable,procedure,Feasible,technical,scheme,safety,assurance,measures,are,put,forward,from,aspects,site,layout,hoisting,equipment,selection,point,control,ensure,implementation,operation,Combined,project,example,construction,challenge,solved,technology,integral,fabrication
AB值:
0.591076
相似文献
机标中图分类号,由域田数据科技根据网络公开资料自动分析生成,仅供学习研究参考。